Customer: TasWater
Key Contact: Noel Luckhurst
JBSE Project Lead: Ben Cross
The Challenge
TasWater recently installed a new pump station and rising main that generated significant surge. The pipeline crossed a bridge – a long, rigid structure that added complexity to the project and required a highly specialised expansion joint to manage movement and stress.
JBSE was presented with an initial design that required further refinement to optimise its suitability for the unique demands of the bridge crossing. The project also featured a tight, four-week deadline, requiring precision, rapid execution, and strong technical leadership.
The JBSE Solution
The JBSE team responded quickly and confidently. Led by Ben Cross, the team reviewed the initial design, identified critical issues, and re-engineered the solution to suit the specific requirements of the bridge crossing.
With the revised design approved, JBSE moved into rapid manufacture, ensuring every stage, from engineering to fabrication, was delivered on time and to exact specification.
The team’s proactive approach and consistent communication gave TasWater confidence that the project would be delivered without compromise.
The Result
- A precisely engineered expansion joint designed for surge control in a bridge-mounted rising main
- Delivered ahead of the 4-week deadline
- Improved safety, flexibility, and system performance
- Seamless collaboration and clear communication throughout
“Their work is exceptional. The turnaround time was impressive; they beat the deadline. Everyone was impressed with the JBSE team.” — Noel Luckhurst, TasWater
Why JBSE
JBSE’s calm, solutions-focused approach and technical capability made the difference on this high-pressure project. The team’s ability to correct complex design issues, manage tight schedules, and deliver a reliable, Australian-made product is what sets JBSE apart.
Would they work with JBSE again?
Absolutely.